Union Estimating LLC

Aviation & Airport Construction Estimating Services

Aviation & Airport Construction Estimating

Aviation & Airport Estimating

FAA-compliant cost estimates for airport terminals, concourses, hangars, and airside infrastructure — with airside/landside separation and phased construction budgets.

48–72 Hr Turnaround
FAA Compliance
Airside & Landside Separation
Phased Construction Budgets
All 50 States

Aviation Estimating Services

Airport construction demands precision, compliance, and phasing expertise. We deliver estimates that reflect the true complexity of aviation projects — from terminal expansions to runway rehabilitation.

01

Passenger Terminal Estimates

Complete cost estimates for new terminal buildings and terminal expansions — including concourse, gate, and passenger amenity areas.

  • New Terminal Building Construction
  • Terminal Expansion & Renovation
  • Concourse & Gate Area Costs
  • Baggage Claim & Handling Systems
  • Security Screening Checkpoint Costs
  • Passenger Amenity & Retail Areas
02

Aircraft Hangar & MRO Estimates

Detailed cost estimates for aircraft hangars, maintenance facilities, and MRO (maintenance, repair, and overhaul) buildings.

  • Wide-Body Aircraft Hangar Construction
  • Hangar Door & Bi-Fold Door Systems
  • Aircraft Maintenance Pit Construction
  • Fuel Storage & Dispensing Systems
  • Ground Support Equipment (GSE) Areas
  • Fire Suppression (Foam/Deluge) Systems
03

Airside Infrastructure Estimates

Cost estimates for airside pavement, aprons, taxiways, and airfield infrastructure — FAA AC 150 standards and airfield lighting systems.

  • Runway & Taxiway Pavement
  • Apron & Ramp Construction
  • Airfield Lighting Systems (AGL)
  • Navigational Aid (NAVAID) Infrastructure
  • Blast Pad & Runway End Safety Areas
  • Airfield Drainage & Grading
04

Ground Transportation & Landside Estimates

Cost estimates for ground transportation centers, rental car facilities, parking structures, and landside access improvements.

  • Ground Transportation Center (GTC)
  • Consolidated Rental Car Facility (CONRAC)
  • Parking Structure Construction
  • Roadway & Curbside Access
  • People Mover & ATS Systems
  • Landside Utility Infrastructure
05

Cargo & Freight Facility Estimates

Specialized cost estimates for air cargo terminals, freight handling facilities, and cold chain logistics buildings.

  • Air Cargo Terminal Construction
  • Freight Handling & Sorting Systems
  • Cold Chain & Perishable Cargo Facilities
  • Truck Dock & Loading Areas
  • Security & Access Control Systems
  • Hazmat Storage & Compliance
06

Airport MEP & Technology Estimates

Specialized MEP and technology cost estimates for airport facilities — BHS, FIDS, CUTE systems, and critical power infrastructure.

  • Baggage Handling System (BHS) Costs
  • Flight Information Display (FIDS)
  • Common Use Terminal Equipment (CUTE)
  • Critical Power & UPS Systems
  • Building Automation & Controls
  • Security & Surveillance Systems

Frequently Asked Questions

Do you estimate FAA-funded airport improvement projects?

Yes. We are experienced with FAA Airport Improvement Program (AIP) projects and can produce estimates formatted for FAA grant applications and AIP compliance documentation.

Can you separate airside and landside costs in your estimates?

Yes. We routinely separate airside and landside costs for funding, phasing, and reporting purposes — a standard requirement for most airport projects.

Do you include phased construction costs for occupied airports?

Yes. We include phasing premiums, temporary facility costs, and operational constraint allowances for construction in active airport environments.

What pricing data do you use for aviation estimates?

We use our proprietary pricing database built from real aviation project data, supplemented by live quotes from our contracted suppliers and vendors. RSMeans is reserved for government and DOB reports only.

How long does an airport project estimate take?

Most aviation estimates are delivered in 48–72 hours. Large terminal or airfield projects may require 3–5 business days depending on scope complexity.

Ready to Estimate Your Aviation Project?

Upload your plans and get a complete, FAA-compliant estimate in 48–72 hours.