Skip to main content
Union Estimating
Takeoff Services›Electrical

Electrical
Estimating & Takeoff

Professional electrical estimating and quantity takeoffs for commercial, industrial, healthcare, and government projects — conduit, wire, panels, switchgear, lighting, low voltage, and all associated hardware. NECA labor hours included. 48–72 hour turnaround.

Conduit & RacewayWire & CablePanels & SwitchgearLighting FixturesLow Voltage SystemsEV ChargingNECA Labor HoursAll 50 States
48–72 hrs

Standard Turnaround

NECA

Labor Standards

All 50

States Covered

100%

Drawing-Referenced

What's Included

Complete Electrical Takeoff

Every electrical takeoff is 100% drawing-referenced — every quantity tied to a specific sheet, panel schedule, or detail. Nothing is estimated or assumed.

Conduit & Raceway

EMT, IMC, RMC, PVC, and flex conduit by size and type — with fittings, couplings, and supports

Wire & Cable

THHN, MC cable, BX, and specialty wire by gauge, type, and circuit — with pull quantities

Panels & Switchgear

Panel schedules, switchgear, transformers, and distribution equipment counts and specs

Lighting Fixtures

Fixture counts by type, wattage, and mounting — interior, exterior, and emergency lighting

Devices & Receptacles

Outlets, switches, dimmers, GFCI, AFCI, and specialty devices by type and location

Low Voltage Systems

Data, telecom, fire alarm, security, access control, AV, and nurse call systems

EV Charging & Specialty

EV charging stations, generator connections, UPS systems, and specialty power equipment

Labor Hours

NECA unit labor hours by work type — or quantities only if you prefer to apply your own rates

Why Choose Us

The Union Estimating Difference

48–72 Hour Turnaround

Complete electrical estimates and takeoffs delivered in 48 to 72 hours. Rush delivery available.

Commercial & Industrial

Office buildings, healthcare, data centers, manufacturing, warehouses, schools, and government — any voltage, any complexity.

NECA Labor Standards

Labor hours based on NECA Manual of Labor Units — the industry standard for electrical estimating.

Excel + Annotated Markups

Quantities delivered in Excel with color-coded PDF markups tied to specific sheets and details.

All Drawing Formats

PDF, CAD (DWG/DXF), Revit MEP, and SketchUp — we work from any format you provide.

Nationwide Coverage

Serving electrical contractors, GCs, and developers across all 50 states.

Project Types

Electrical Estimating for Every Sector

We provide electrical cost estimating and quantity takeoffs for commercial, industrial, healthcare, government, and multifamily projects — any voltage, any complexity, any delivery method.

Commercial Office & Retail

Power distribution, lighting, data/telecom rough-in, fire alarm, and tenant improvement electrical scopes. Selective demolition of existing systems included.

Healthcare & Hospitals

Isolated power systems, emergency power, nurse call, medical equipment connections, and specialty healthcare electrical — the most complex electrical scopes we handle.

Industrial & Manufacturing

Large motor loads, VFDs, specialty power distribution, process equipment connections, and high-bay lighting. Equipment pricing from manufacturer quotes.

Data Centers

Critical power distribution, UPS systems, PDUs, generator connections, and redundant electrical infrastructure. Tier-specific design requirements addressed.

Government & Institutional

Federal, state, and municipal projects with prevailing wage labor requirements. Certified payroll-compatible labor breakdowns available.

Multifamily & Mixed-Use

Unit-by-unit electrical takeoffs, common area distribution, amenity spaces, EV charging infrastructure, and site lighting for multifamily and mixed-use developments.

FAQ

Electrical Estimating Questions

Trade Services

Explore All Trade Takeoffs

Union Estimating covers every major trade — from structural to MEP to finishes. Each takeoff is drawing-referenced, annotated, and delivered in 48–72 hours.

Ready for Your
Electrical Estimate?

Send us your electrical drawings and we'll have a complete, bid-ready estimate back to you in 48–72 hours.

State Coverage

Electrical Estimating by State

We provide state-specific electrical estimates that account for local code requirements, labor markets, and permit processes. Select your state for detailed coverage.

More states added regularly — contact us if your state isn't listed yet.